Crofton Fire Hall Expansion

Crofton Fire Hall Expansion

Project Address

1681 Robert Street, Crofton

Client

North Cowichan

General Contractor

Unitech Construction Management

Value

N/A

Services

Monitored Video Surveillance

About the Crofton Fire Hall

  • The existing fire hall in Crofton was constructed in 1964. A second floor addition was added sometime later, and the apparatus bays were built in 2002.
  • A number of assessments and studies have been conducted in order to identify deficiencies and recommend long-term options for the fire hall. This includes a 2018 Facility Condition Assessment, a 2019 detailed Seismic Assessment, and a 2019 Load Rating Study for the second floor.
  • The assessments and studies conclude that the existing fire hall is in immediate need of seismic upgrades and urgent repairs, and given the cost of these repairs, it is recommended the fire hall be demolished and rebuilt in its current location.
  • The second floor was closed to all use in 2019 following the load rating study as it was deemed unsafe. Replacing second floor joists could address the load bearing issues, however seismic issues would still need to be addressed.
  • The newer apparatus bays, built in 2002, are not in need of repairs.
20

Years in Business

12 000+

Clients Served

24/7/365

Hours of Operation